Firmac once again exhibited at the Big 5 Dubai, Dubai World Trade Centre.

The Firmac team were on hand to advise on duct forming and roll forming technology and consult on factory layout for optimal duct production. 

Visitors were interested to learn about Flameshield® Fireduct, a non-coated fire-rated ductwork system manufactured on Firmac’s CGF1 Pro Duct or CGF1 MDF. This system is made from galvanised sheet metal and is the UK’s first non-coated, fire rated ductwork to achieve LPCB certification for both BS and EN standards. 

Flameshield Fireduct has been installed into some of the UK’s most prestigious buildings including the Shard, the Olymic Stadium, St Bartholomew's Hospital and AWE Aldermaston.